[UIT] Office Relocation
For the UIT office relocation, we successfully handled the decommissioning, relocation, and reinstallation of IT infrastructure across the entire building.

<
>
Our key tasks included:
Powering down and dismantling network equipment, ensuring secure packing for transport.
Deploying and configuring the firewall, switches, NAS, and access points (APs) in the new server rack.
Installing structured cabling, switches, and APs throughout all floors to establish a stable network connection.
Setting up and configuring the IP phone system for all users to facilitate seamless communication.
Documenting network and cabling configurations for future reference.
Conducting connectivity tests to verify that all systems were properly integrated and fully operational
This relocation project ensured a well-structured and efficient IT infrastructure, allowing UPH to resume operations smoothly in their new office.