Relocating an office in Singapore's fast-paced business environment requires more than just moving boxes—it requires a precision-engineered IT transition to ensure zero downtime. Recently, the ML Systems Integrator (MLSI) team completed a comprehensive IT relocation and infrastructure overhaul for 1291 Asia Pte Ltd. From high-speed WiFi 7 implementation to complex firewall migrations and telephony integration, we ensured a 'Day 1 Ready' office setup.

Relocation old office and new office by ML System Integrator
<
Relocation old office and new office by ML System Integrator
Neat server rack with Ruijie switches and CAT6 cable management
Installation and management of cable telephony
Installation and management of cable telephony
Television installations by ML System Integrator
Testing network point
Installation LED
Setup meeting room
LED emergeny lamp setup
>

The tasks completed include:

  • correct_iconDelivery and installation of 30x CAT6 network cables and 4x Cable Management Panels with 2x Ruijie RG-ES228GS-P 24-Port Smart Managed PoE Switches; all data points including C-Suite and Main Conference rooms verified with DHCP and Ping tests
  • correct_iconDeployment of 3x Ruijie RG-RAP72 WiFi 7 Access Points with deep network optimization to eliminate dead zones and ensure seamless roaming across guest and corporate networks
  • correct_iconFortiGate 61F Next-Generation Firewall migration with WAN/Internal interface reconfiguration and trusted host access management via console cable
  • correct_iconNEC SL1000 Phone System configuration with full extension setup and user guides, plus installation and testing of 5x Poly ATA 400 devices for Starhub Smart UC
  • correct_iconNetwork integration of Canon IR-ADV C5535 including scan-to-email and secure print testing
  • correct_iconProfessional server room optimization: unbundling legacy cables, repositioning rack for improved airflow, and accommodating new industrial printer/copier
  • correct_iconTesting, Documentation, Ticketing and User Acceptance Test across a phased onsite approach from March 9th to March 19th
Through a phased onsite approach, MLSI delivered a 99.9% uptime guarantee during power and electrical testing phases, a fully documented network with updated floor plans, server rack diagrams, and patching details, and true Day 1 Productivity—staff arrived at the new office with working phones, high-speed internet, and a secure environment. This project demonstrates that a successful office relocation is built on meticulous planning, rigorous testing, and expert multi-vendor coordination.