[CICF] Office Relocation
As part of the CICF office relocation, we successfully handled the dismantling, transportation, and reinstallation of critical IT infrastructure.

<
>
Our tasks included:
Safely shutting down and dismantling infrastructure equipment before securely packing for transport.
Installing and configuring the firewall, switches, NAS, and access points (APs) in the new office’s server rack.
Setting up and organizing cabling while updating documentation for accurate connectivity records.
Conducting network tests (ping tests) to ensure all hardware was properly connected and fully operational.
This process ensured a smooth transition with minimal downtime, allowing operations to resume seamlessly in the new location.